Your Guide to a Smooth Start-up of your Watertronics Pump System
Get your FREE Pump Station Quick Start Guide Today!
The Importance of a complete Pump Station Start-up Plan
The PSN field technician calibrates the pump station to the water distribution piping system with the assistance of the system operator. The field technician completes the startup checklist including checking all connections on the station and within the panel, confirming motor rotation, recording incoming power readings per phase, and additional data that is archived in the PSN installation database for future reference. Station performance including capacity and pressure are verified, pump sequencing including EBV operation is confirmed and any special programming is tested. Station telemetry and connectivity are verified as a final step of system commissioning.